Then today, PD was back on site at 7am and dug 66 piering holes ranging in depth from about 4 metres at the rear to 2.7 at the front of the house location.
Later today the concrete trucks arrived and all the holes have been filled with the cement slurry. This concrete piering will support the slab.
No comments:
Post a Comment