Saturday 22 February 2014

Christmas over and a new year - the journey 22 December to 22 February 2014

Well Christmas came and went. We had hoped to have some tiling done but the tiler wasn't sure which drawings to use so it didn't really happen until early January.

When it did though, we were off. Below are some updates on the progress to date... enjoy !

Upstairs shared bathroom (prep)...


Kitchen island bench..


Powder room...


Master ensuite shower...


Master ensuite WC...


Master ensuite dressing table...


Laundry...


Powder room...


Upstairs bathroom shower...


Shared ensuite shower...


Upstairs bathroom bath tub meets the shower...


Stairs stained (english walnut)...


Master feature colour (Wattyl Chocolate bar)


Bulkhead finished in laundry, ready for painting...


Master with tiling and mirror...


Master rain head shower and glass wall...


Master ensuite with view to master, also in chocolate bar...


Shared ensuite glass installed...


Upstairs bathroom mirror and tiling...


Activity room in chocolate bar; should look great with feature plantation shutters...


Our storage cupboard....


Theatre room feature wall and door (english walnut)...


Outside render and fireplace jut-out...


The alfresco...

The front door... (english walnut)

The facade (before)

The facade (latest)... love it !!